Data centre project · Finland

Kitee

In developmentgreenfield⬇ Download PDF

Kitee

10ha located in Eastern Finland ready to build 2027.

Public Status

Project developers
—

Location

Nearest seaport
Kotka ↗ · 250 km
Nearest airport
Savonlinna Airport (SVL) ↗ · 65 km
Site size (ha)
10
Local population
—
Area overview
The Kiteezi Landfill, also known as the Kiteezi Rubbish Dump, is a solid waste disposal site in Uganda. It is the main solid waste disposal site for the capital city of Kampala, with a projected metropolitan population of approximately 4 million people, as of 2024, serving the homes, businesses and industries of that metropolis.
Free-cooling hours / yr
7775
Population within 50 km
48534
Hot days / yr (>25 °C)
—
Cold days / yr (<-10 °C)
—
Daylight (solstice)
—
Time zone
—
Nearest HV substation
—
Substation distance (km)
—
Grid carbon (gCO₂/kWh)
—
Industrial elec. price (€/MWh)
—
Grid mix
—
Distance to peering hubs
Frankfurt: 1867 km · Stockholm: 724 km · London: 2157 km · Amsterdam: 1846 km
Zoning status
Already zoned, building rights 50% (raisable to 70% via deviation permit, ~4 weeks per Mayor).

vs. Frankfurt baseline

Avg temp
4.9 °C -6.5 °C vs FRA
Free-cooling
7,775 h/yr +3,575 h vs FRA
Grid carbon
—
Industrial price
—
Avg annual temp (3 yr)4.9 °C
-15°-10°-5°0°5°10°15°20°AprJulOct2024AprJulOct2025AprJulOct2026Apr
20 °C max · -13 °C min

Power

Power source
Mixed Clean
Initial MW
30
Target MW
30
Max capacity (MW)
30
Power notes
—
Power availability (public text)
—
Connection voltage
110kV
PPA status (public)
—
Heat reuse
Planned

Design

IT load (MW)
48
Design PUE
1.15
Rack density (kW)
40-70 kW (Air) / 132-400 kW (DLC)
Cooling
Air — perimeter; DLC — room-level CDU
Workload mix
Training & possibly inference

Connectivity

Fibre providers
Elisa, Telia
Fibre speeds (Gbps)
400G DWDM (dual/protected)
Latency to key markets
Frankfurt ~17–31 ms · London ~31–35 ms · Paris ~35 ms · NY ~95–105 ms.
Fibre commentary
Municipality confirmed no fibre availability concerns. Telia 400G DWDM proposal: OTC €310k, MRC €6,180/mo.

Timeline

Ready-to-build date
—
Energisation date
—

Narrative

News & press
—
Project description (long)
Identified March 2025, located on the Puhos industrial park. 50 MW data centre with on-ward expansion potential, fully backed by Kitee municipality and Business Joensuu. Undulating topography on a moraine deposit currently being excavated.

Considering Kitee?

Request an RFI pack for this specific site — power, fibre, timeline, commercial terms.