Frankfurt: 1864 km · Stockholm: 705 km · London: 2136 km · Amsterdam: 1830 km
Zoning status
Parcel A zoned. Parcel B requires zoning (consultant-led).
vs. Frankfurt baseline
Avg temp
5 °C-6.4 °C vs FRA
Free-cooling
7,705 h/yr+3,505 h vs FRA
Grid carbon
—
Industrial price
—
Avg annual temp (3 yr)5 °C
20 °C max · -13 °C min
Power
Power source
Mixed Clean
Initial MW
60
Target MW
70
Max capacity (MW)
70
Power notes
—
Power availability (public text)
—
Connection voltage
110kV
PPA status (public)
Available subject to permits
Heat reuse
Planned — local offtakers available, district heating demand identified.
Design
IT load (MW)
80
Design PUE
1.15
Rack density (kW)
40-70 kW (Air) / 132-400 kW (DLC)
Cooling
Air — perimeter cooling; DLC — room-level CDU
Workload mix
Training & possibly inference
Connectivity
Fibre providers
Elisa, Telia
Fibre speeds (Gbps)
400G DWDM (dual/protected)
Latency to key markets
Frankfurt ~17–31 ms · London ~31–35 ms · Paris ~35 ms · New York ~95–105 ms (via Helsinki: Sea Lion to Germany, two cables to Sweden, Northern Cable under construction).
Located just outside Joensuu, a regional hub for eastern/central Finland. The Liperi project, identified February 2025, is being established in tandem with the Kitee project with the full backing of Liperi municipality and Business Joensuu. Land: very flat with sporadic woodland close to existing industrial zone, main road adjacent.
Considering Liperi?
Request an RFI pack for this specific site — power, fibre, timeline, commercial terms.