New location coming soon in the Baltics.
Public Status
- Project developers
- —
Location
- Site size (ha)
- —
- Local population
- —
- Area overview
- —
- Free-cooling hours / yr
- —
- Population within 50 km
- —
- Hot days / yr (>25 °C)
- —
- Cold days / yr (<-10 °C)
- —
- Daylight (solstice)
- —
- Time zone
- —
- Nearest HV substation
- —
- Substation distance (km)
- —
- Grid carbon (gCO₂/kWh)
- —
- Industrial elec. price (€/MWh)
- —
- Grid mix
- —
- Distance to peering hubs
- —
- Zoning status
- —
Power
- Power source
- —
- Initial MW
- 50
- Target MW
- 200
- Max capacity (MW)
- 200
- Power notes
- —
- Power availability (public text)
- —
- Connection voltage
- —
- PPA status (public)
- —
- Heat reuse
- —
Design
- IT load (MW)
- —
- Design PUE
- —
- Rack density (kW)
- —
- Cooling
- —
- Workload mix
- —
Connectivity
- Fibre providers
- —
- Fibre speeds (Gbps)
- —
- Latency to key markets
- —
- Fibre commentary
- —
Timeline
- Ready-to-build date
- —
- Energisation date
- —
Narrative
- News & press
- —
- Project description (long)
- New location coming soon in the Baltics.